Aldgate Tower

Office Projects

Aldgate Tower

 

© Liam Hayes

Client: FT Squared

Discipline: Building and M&E Clerks of Works Services

Construction value: £74.5m

Awards:

  • 2015 – Gold Award – The Royal Society for the Prevention of Accidents
  • 2015 – Gold Award – National Considerate Constructors Scheme
  • 2014 – Silver Award – National Considerate Constructors Scheme
  • 2014 – Performance beyond compliance – National Considerate Constructors Scheme
  • 2014 – Gold Award – The Royal Society for the Prevention of Accidents
  • 2013 – Performance Beyond Compliance – National Considerate Constructors Scheme

Project Description:

Aldgate Tower provides brand new state of the art £74.5M Grade A office facilities which our Building, Mechanical and Electrical Clerks of Works inspected to ensure it achieved a BREEAM ‘Excellent’ rating. The main facades are clad with a fully glazed, full height aluminium framed curtain wall system. Solar control is provided by soft coatings to all the glazing. Two 11KVA ring main units provide electricity to the building supplemented by a roof mounted photo-voltaic (PV) cell electrical generation system. A solar thermal heating system was installed and will pre-heat the domestic water service prior to heating by gas fired water heaters.

Hickton Quality Control

Amber Court
51 Church Street
Elsecar
Barnsley
South Yorkshire
S74 8HT

 

Legals

Terms & Conditions
Privacy Policy
Cookie Policy

Twitter
LinkedIn
Instagram